Project Brief: Hotel Monteleone

The Carousel Bar at the Hotel Monteleone in New Orleans with its new bar top

A hospitality case study

Project Brief: Hotel Monteleone

New bar tops for a French Quarter landmark, New Orleans.

Photo: Josh Lloyd Media

The project

Some bars are just bars. The Hotel Monteleone at 214 Royal Street is not one of them. The Carousel Bar has been turning since 1949, and people come from all over the world to take a ride.

When the top from the original fabricator stopped holding up, the Monteleone called us.

01

When the original top failed

I built tops the old way for years. I watched those wooden cores fail. That’s why I started 3 Spark.

So I know what a top that isn’t holding up looks like: wear, stains, open joints. On a landmark bar, the hotel needed somebody to answer the phone, show up with a plan, and get it right.

That’s the part we take personally. Our clients’ problems come first.

Worn surface on the previous Carousel Bar top before replacement, Hotel Monteleone, New Orleans
Before
Open joint in the previous Carousel Bar top before replacement, Hotel Monteleone, New Orleans
Close-up of the custom zinc edge profile on the Carousel Bar, Hotel Monteleone, New Orleans
Custom edge profile

02

What we did

We moved fast. Quick answers, a clear plan, and a crew ready to go.

We designed a custom edge profile, just for them. We didn’t pull a stock trim off the shelf. We drew an edge profile for this bar alone, and it isn’t reused on other projects. On a bar people lean on all day, the edge is the part everyone touches. It sets how heavy or light the bar reads, how the light rolls off it, and how it feels under a forearm on the third round.

We redesigned the surface. We use deposition to apply thin coats of material in a controlled manner to build up the surface, which lets us take on complex curves and custom edge profiles. The surface is real zinc, over a waterproof core.

We worked around the hotel’s schedule and delivered on time. A working hotel bar can’t wait on us, so we planned the job around their calendar and hit the date.

Crew applying a protective finish to the new bar top on site at the Carousel Bar, Hotel Monteleone, New Orleans
Protective finishing applied on site.

03

Why it matters

Smart design plus technical know-how gets you a top that’s made for the bar, instead of a bar forced to fit somebody’s trim. That’s what we do: custom objects, not off-the-shelf trims.

New zinc top around the carousel column at the Carousel Bar, Hotel Monteleone, New Orleans
Edge detail of the new top at the carousel column, Hotel Monteleone, New Orleans
Curved sweep of the new zinc bar top at the Carousel Bar, Hotel Monteleone, New Orleans

Photo: Josh Lloyd Media

Wide view of the installed bar top at the Carousel Bar, Hotel Monteleone, New Orleans

Planning a bar that has to live up to its history?

Or living with a top that isn’t holding up? Reach out to me. Let’s talk about your project.